6/3/26
JRC
Load then Drop white trailer at SSY
Pick up Mast from PBM
Arrive SSY - Step mast
Drop White Trailer into Burl
Pickup parts for Williston Job and deliver to Williston
GERRY
Meet SSY 0900
Mast stepping with JC
All boats dock lines replaced with new standards
Blue List
Install boom
Install sails
Install Vang
Install stern light
Test all lights and systems
Connect mast base wires
White List
Wipedown all surfaces (only if time)
Install stanchions with Dan (possible charlotte run to pick up fasteners arriving today)
RYAN
Meet FDM 0900
White list
Clean prep head for toilet install - Head needs MAJOR deep scrub back to rights
Install head
Plumb to new holding tank
Remove old deck pumpout (currently in head)
Reinstall deck pumpout forward
Get Festool small sander and vacuum to end of dock
Install battens in Main
Possible Winooski run to pick up parts TBD
NATE
Boathouse 0900 - Depth sounder install
White List
Sand, prep, install aft cockpit starboard covers
Sand prep install old pumpout cover
Lay new Floorboards
Wrap up day with any remaining floorboard epoxy as needed at shop
Other stuffs as needed
DAN
SSY 0900
Commission Deslauriers
Check on other boats as needed at SSY
Blue mast stepping if needed - proceed to FDM
White List
Stanchions with Gerry
Lifelines
Water system install