6/3/26

JRC

Load then Drop white trailer at SSY

Pick up Mast from PBM

Arrive SSY - Step mast

Drop White Trailer into Burl

Pickup parts for Williston Job and deliver to Williston

GERRY

Meet SSY 0900

Mast stepping with JC

All boats dock lines replaced with new standards

Blue List

  • Install boom

  • Install sails

  • Install Vang

  • Install stern light

  • Test all lights and systems

  • Connect mast base wires

White List

  • Wipedown all surfaces (only if time)

  • Install stanchions with Dan (possible charlotte run to pick up fasteners arriving today)

RYAN

Meet FDM 0900

White list

  • Clean prep head for toilet install - Head needs MAJOR deep scrub back to rights

  • Install head

  • Plumb to new holding tank

  • Remove old deck pumpout (currently in head)

  • Reinstall deck pumpout forward

  • Get Festool small sander and vacuum to end of dock

  • Install battens in Main

Possible Winooski run to pick up parts TBD

NATE

Boathouse 0900 - Depth sounder install

White List

  • Sand, prep, install aft cockpit starboard covers

  • Sand prep install old pumpout cover

  • Lay new Floorboards

  • Wrap up day with any remaining floorboard epoxy as needed at shop

  • Other stuffs as needed

DAN

SSY 0900

Commission Deslauriers

Check on other boats as needed at SSY

Blue mast stepping if needed - proceed to FDM

White List

  • Stanchions with Gerry

  • Lifelines

  • Water system install