Week of 05/12
JC
delivering Remedy to Hyannis
******************************************************************************************************************
Dan
Copperline
Install new masthead wind wand with Ryan
Test all running lights and any other electronics report back
Water test for leaks that might provide clue to galley floor water
Move boat to LCYC with Ryan - car drop first thing as Ryan comes by
Morse, Install mast collar use Ryan for help as needed
Conroy through hull installation
VanWees
Review engine hose - raw water intake hose leaking at fitting above engine dripping onto starter area… most likely replace to stop water intrusion.
Flush water and review water heater install. Should probably have bypass installed (not critical right now but on the radar).
Hull wear area at leading edge of rudder needs to be prepped and barrier coated - Interprotect 2000 in the trailer
*******************************************************************************************************************
Ryan
Drop car at LCYC - coordinate with dan
Help Dan wrap Copperline
Help Dan with Morse
Help Dan with Conroy through hull installation
Rebecca
List as directed
*******************************************************************************************************************